all right good evening everyone welcome to a special meeting of the city council uh the purpose of tonight's meeting is to get uh public input on the capital budget uh for 2021 2022 fiscal year and the capital improvement la plan for the 2021-22 fiscal year through to 20 25 26 fiscal year so uh let's get the show on the road okay good evening and welcome to a special meeting of the council of the city of long beach held thursday may 6 2021 at 7 pm we'll have a roll call council member delorey that's it councilmember mandel president councilmember treston president vice president mcginnis president president pando present let the record indicate the presence of city manager donna gayden and assistant corporation council joe lupo will now salute to the flag all right mike you got the big flag fl uh behind you tonight why don't you uh lead us in the pledge okay hand over heart i pledge allegiance to the flag of the united states of america and to the republic for which it stands one nation under god indivisible with liberty and justice for all okay our only item this evening is a public hearing for the purpose of giving citizens an adequate opportunity to publicly present their views on the general summary of the capital improvement program for the five year period from july first twenty twenty one to june thirtieth twenty twenty six okay uh so let's open the hearing and uh i guess before we go to the public i'll just ask quickly if anybody on the council has any questions okay seeing none uh who do we have from the public dave well i i believe we have uh mr fabrizio has his uh oh i'm sorry i'm sorry sorry sorry that's right i'm jumping ahead trying to get the meeting over that much quicker are we done okay sorry joe i was stealing your thunder all right i assume you're going to give us a presentation yeah dave can you put it up on the screen please oh great thank you everybody um yes i hope so everybody got a chance to go outside today it was an absolutely beautiful day um my name is joe fabrizio i'm the commissioner of public works i'm here tonight to present the 2021-2022 capital budget and 2021 22 2025 26 capital improvement plan for the city of long beach um before i get started i just wanted to thank all the department heads and the commissioners who helped me with this specifically um the controller uh you knew resnick she was really uh just really really helpful and i really appreciated it and as well uh the city manager donna gayden you know they really uh really their expertise and professionals are really really helping me here um thank you so we can go to the next slide thank you dave okay the 2021 2022 capital budget and five-year capital improvement plan advances projects that improve the health safety and quality of life for city residents the projects address issues in a priority order making government more efficient and responsive projects this year include a continued commitment to roads and drainage shoreline transportation improvements to police and fire assets buildings uh grounds which includes trees and dune plant things parks technology uh sewer which is the wastewater treatment plant and the rehabilitation of the sanitary sewer system um water replacing our ag infrastructure and improvements to our water treatment plant and other things such as economic development next please um as i mentioned you know this was my for i've been working here for 30 years and i've assisted four commissioners on capital budgets but this is the first one that i've done solely on my own so i just thought i wanted to take i took a couple slides to really just walk through the process because you know it was really an educational process and i don't know if people really realize how much work actually goes into it so i just wanted to go through real quick um in january we basically uh send a request to all department heads and commissioners to fill out capital project summary forms in those forms we ask for the name of the department requesting the project the project category description of the project project justification on estimated cost of construction in february all of those project summary forms are due in march the controller myself the city manager we start conducting meetings with all department heads and commissioners regarding their proposed projects next please in march you know during that same period we also perform a comprehensive review of all the existing available funds from prior year capital budgets that are available and have not been utilized this was actually probably one of the most interesting exercises that i had going through um i looked through all every h line from 2015 to present and it's probably a discussion for another night but there was you know quite a bit of money that was um not spent that we're currently paying interest on that was you know quite enlightening um that i brought to the city manager's attention and um you know she was actually you know brought aware of it and um we've had a lot of meetings about it since um in april 2021 additional meetings are conducted with commissioners and departments prioritizing proposed projects in april as well the projects are selected and incorporated in the capital budget and and the plan um by the end of the month by the end of april that is the proposed capital budget slash plan is submitted to the city manager in the council prior to the hearing uh the capital budget improvement plan is submitted to the city clerk and it's made available for inspection prior to hearing on the document on may 6 which is tonight we have the public hearing so people can comment on it um after the public hearing i will make any changes based on the comments that i receive and on may 18th it's put before the council for a vote next please um this is a breakdown of the capital plan um if anybody listened to the budget hearing on tuesday night um city control that is did a really really great job of explaining the difference between the general fund the sewer fund and the water fund uh but the general fund is basically broken down and for the capital purposes is broken down into the roads of drainage shoreline transportation public safety grounds parks and technology this refund is essentially the collection system the water pollution control plan and equipment associated with it and the waterfront is the distribution system um the water treatment plant and equipment next please um highlights of our proposed plan who are asking for 5.2 million in the general fund 600 000 in the sewer fund and 4.3 million in the water fund grants where bonding is required is approximately 38.2 million that number is basically the money most of the money for the north shore critical infrastructure project that has a 33 million price tag with the fema projects you basically have to fund the money and then you get reimbursed um the grants where no bonds required to 18.7 million that's essentially the ghoster projects the governor's office the storm recovery projects with those projects it's a little different it's actually a great program we don't have to front any money the contractor basically submits his claim voucher and invoices we submit them to the governor's office of storm recovery we get reimbursed from the governor's office of storm recovery and then we remit payment within five days so it's actually one of one of the best programs that i've ever worked on um and we have approximately 18 million dollars under that program um next please i wanted to take you through and it's a little lengthy but you know we've done a lot of work and over the last year i thought it was important to highlight that um so someone has successfully completed projects um one the first one on the list we're actually just about finished with it's going to be finished in june anybody who's gone down edwards can see it it's a reconstruction of edwards boulevard between park and broadway we've overlaid 15 streets wisconsin park to ocean view state street monroe neptune broadway monroe lincoln broadway neptune to roosevelt beach riverside to national harrison lincoln to franklin pan long beach road to franklin broadway long beach road to monroe beach uh long detroit's riverside so we've really stepped up our overlay program um and we're going to continue to do that box and recreation um if anybody's gone over to veterans memorial park we removed the existing surface of the hockey rink and put a state-of-the-art concrete surface um from what i understand i'm not a skater but it's been well received and it's really getting a lot of use and we've installed a lot of water fountains at the at the veterans memorial park as well uh buildings um right outside city hall here where we've designed and we're under construction with the rehabilitation of the parking garage it's in progress things are going fairly smoothly right now um we're also we bid out and we will be commencing work on facade city hall probably in the next month or so you'll see a resolution to award that project that basically involves repairs around the whole perimeter of city hall to the brick masonry facade next please um sewer projects most of the money that we did in sewer was emergency replacement of uh sanitary sewers one was the intersection of walnut and lindell which was a big project that we undertook over the winter was a collapse of the existing sanitary so we were about 12 feet down below grade and right now actually today you know we had a lot of problems on this job it was um the north side of west park between um what new york avenue and bramble a lot it started out as uh one location that we thought was had to be replaced but we've actually done three excavations in the last two weeks and i think today we finally successfully completed that repair and the sewage is flowing and it's in everything's going well as far as water projects we designed well number 19 i'll get into that a little later in the presentation we demolished the 1 million gallon standpipe uh which was a the existing standpipe was over 100 years old um and that had to be removed and we did the design of what's called the enclosure over the open air basins at the work for your water verification file next please now for this year the upcoming projects we have a lot of work on our plate as usual i'm not sure if anybody's driven around you can see everywhere you go just you know some work going on some fashion for roads and drainage we're gonna um the next in-house design that we're gonna undertake is the reconstruction of doyle which means chester pine we'll design that utilizing uh in our in-house forces and um there's money in the capital budget to reconstruct that that roadway um one of the biggest projects that we're working on is the drainage improvements project that project has been awarded to j.r cruz for the general construction and i think electric for the electric it's basically going to be uh involves park avenue between new york to nevada they're going to be putting in a new stormwater pump station at tennessee avenue as well as uh putting a whole bunch of subsurface drainage on that thoroughfare to mitigate flooding on national south of clock same thing we're going to be putting in an entire new subsurface training system it's actually going to mirror um exactly what edwards boulevard's out the park is going to look like so both by the end of the year or february 2022 both edwards and national which are the main conduits from the railroad are going to pretty much be identical and completely repaved so i mean it's actually a really exciting project and the intersection riverside pond we're going to be increasing the drainage by putting in new structures another project we're going to be doing is called park avenue resilient connectivity the department of economic development retained a 2.5 million dollar grant to basically um to do aesthetic rehabilitation of park avenue between long beach road and roughly magnolia boulevard um the intent is to overlay that entire area which anybody who's driven it needs it knows it needs it we're going to be replacing curbs sidewalks overlay of the road new lighting um so that's a great project that's included in this capital budget now the shoreline yeah i've mentioned this project numerous times can't come soon enough it's called the north shore critical infrastructure protection project it's a 33 million dollar project that's 100 funded by under the fema 406 404 hazard mitigation program um we're still working with the railroads to revive resolve some on some issues that's the last hurdle to moving forward we're hoping we could saw the body into the year next please um as far as buildings again we're going to be rehabilitating the city hall facade which i mentioned earlier and it's going to start probably in the next month or so we have money to rehabilitate city council chambers in 6th floor to renovate the 6th floor bathroom to complement our recently constructed oem building we have funding for to mitigate uh the exterior of the ice arena as well as the martin luther king center and animal shelter as far as parks you're going to see a resolution in june to replace the pool liner at the recreation center is where wells repair the balcony wallets in uh that state of repair means it needs to be repaired um we're planning on closing the pool in july to do that project so um you'll see a request for as a resolution on the june agenda for that project next please uh public safety um yeah i met extensively with um the police commissioner um and incorporated in the plan is uh the purchase of three new patrol vehicles which they desperately need as well as um gators and i think they use to control the boardwalk um also right now we i think we're gonna have from what i understand our first female firefighter um so it's imperative that we give them the facilities that they need it's also going to be utilized by the female police officers so they're going to be writing installing a new uh women's police department and fire department locker room and shower um there's also a whole slew of upgrades um technology upgrades for the for the police department um the commissioner he can probably weigh in later better than i can explain because it's a little technical a lot of things that they want to do but they're all needed from what i understand and also a lot of work in the precinct we have some funding to do some work in the general work in the precinct um the fire department this is a mistake this actually isn't supposed to be here this is my mistake as far as the ambulance that's actually not supposed to be an attack it's actually in the operating budget it's going to be leased and the same thing the uh ppe the personal protective equipment that is also in the operating budget that wasn't supposed to be in this presentation it will be removed from the um from the final capital plan because again these are not in the capital plan it's actually items that are in the operating budget not the capital budget so um shouldn't really be in this presentation but it was an error on my on my end next please um as far as the water you know we have we have a lot of work to do on our water system on the sand filters in our in our water treatment plant we have 10 of them they haven't been addressed or rehabilitated i should say in the last 20 to 25 years um our intent we put 250 000 in the capital plan that's the cost to rehabilitate two of them we'll do two and we have uh in the budget to do two for the next five two every year for the next five years which will rehabilitate all ten of them um as far as construction of new weld wall house the design is underway right now the city has eight wells active wells in the city that provides us our drinking water they come from the lloyd aquifer um unfortunately three of them are out of service number 16 is collapsed number 17 i was getting high salt water readings and number 11 we're having serious problems with right now and we fear that it's collapsed as well so the five remaining wells three of circa 1960 um so it's imperative i mean it's a big chunk of the capital improvement plan we have four million dollars in there to um to build a well my my goal is if this is approved is to have it built um by this time next year um there's a water system component again which is basically um replacing the water mains on the new roads that we that we um reconstruct for example on boyd street there's basically a water sewer and a general construction component um so this the water system component falls under the water in the capital plain and high pump replacement there's five pumps that pump the water at the plant um there's money in there to replace those five pumps that are you know that are needed repair um as far as sewer we only have 600 000 miles i mean again that's on another slide but it's basically for um emergency sewer repairs replacement and um for our rotary construction projects next please now this just these these next two slides basically give just a little more detail uh kind of expands upon the previous slides it gives you a little more detail i'm not going to go through them all in detail but i'll explain like the first one and the second one just to give you an idea of what i'm trying to present here um like the first one is road reconstruction i'm asking for eight hundred thousand dollars in new funds there's thirty one thousand that current is that exists in our capital from old capital budgets um so you can so in other words you're at the bottom of 31 conservative bonded for um so we're basically we're going to need 800 000 to be bonded so that would give me 800 if you had the two together in this case you'd have 831 000 um and this would go towards the doyle street reconstruction that we're proposing for next year overlays basically again we're asking for 150 000 new funds for overlays there's 159 in existing so if you total them together we would have uh 300 plus we have money from um it's called chips it's uh it's grant money that we get agile um and in this case we actually have money from pseg to do some overview work as well so we're going to do a lot of overlay work next year our roads are in disrepair and we're really trying to um be aggressive with that um current sidewalk replacement 50 000. that's with projects like i don't if anybody's been in front of bank of america or for jj cooper as you see a lot of concrete work done in the middle to replace defective areas that's what that money is used for that's basically repair city uh streets and sidewalks that's what we use that money for um park avenue resiliency i mentioned that earlier there is a grant that's associated with that so this 1 million 25 is part of the match that we need for the 2.5 million dollar grant um so it's important that we have that in there um a trolley that 68 000 is the city's share um from the department of transportation um 540 thousand i should say forty five hundred forty thousands from the department of transportation 68 is required from the city um as i mentioned earlier regarding the police um we put in 1 million 28 500 for um that's three police vehicles three gators various technology upgrades and precinct upgrades on fire department as i mentioned earlier this was a mistake that's not supposed to be on the chart that is coming from operating now so that um just please ignore that one line um the pool on our recreation 100 000 of that is going to come from community development block grant money so on the city's obligation to that is only 15 000. we've received bids from a company called renisus construction for 114 700 um so that 15 000 is to give us 115 000 that we need um to build that project in july ice arena roof for requesting 800 000 to repair the roof it's in severe state of disrepair it needs to be replaced um this 490 000 requested to renovate fire department headquarters um you know i've been in there it's it's way overdue um they deserve it they need it um that's work that our beach maintenance department with their skilled carpenters is going to undertake um next slide please um sold storage dome this is another grant that we have um the grant is for approximately 110 000 uh we already have 50 000 of it available so we're asking for another five this is going to be the 55 000 uh match for and ten thousand dollar project um you back up generator city hall we already have 120 000 existing funds i've gotten readiness recent estimates from consultants that the project is more in the area of 250 000 that's why we're asking for another 130 uh roofing this is to address roofing um in areas like our police auxiliary building in various buildings around the city uh tree planting now this is interesting in order to um to to build edwards and nationals out the park we actually took the landscaping out of the project um so we could come in on the within budget to build those projects we took it out so our city uh forces are ultimately going to do this work in the spring and the fall um so that's what that tree planting money is going to be for it's basically the landscape national and edwards south of park um the fencing is 50 000 just for various repairs around the city the next three are really related to economic development um patty bourne um spearheading these efforts um you could certainly ask her if you have more specific questions about those but it's a hundred thousand dollars for economic development zoning study the eaf slash eas for a zoning study and also hundred thousand for parking stuff uh sewer upgrades at six hundred thousand that's essentially for unforeseen uh repairs to the sewer system and um sewer replacements on our complete streets projects uh the well which i mentioned previously you know that's probably the most important thing on this list at least from my perspective um again we have eight wells only five are active three are out of service uh sand filter rehabilitation two hundred fifty thousand that's to do two in the coming year out of the ten that we have and hundred 000 is for various improvements at the water treatment plant next please so in summary we're requesting 5.2 million dollars in the 2021-22 general fund improvements and 4.9 million total for the sewer and water fund the breakdown is shown below there the general fund is five million two fifty one five hundred the sewer fund is six hundred thousand and the water fund requested four million three fifty that total is approximately 10.2 million again it's it's this isn't much you know it's higher than last year's and and the main reason is the well if you take out the well you know we're more on the range of what a typical capital plan is but it's um it's a crucial project and and i recommend that we move forward with it next please and um that's pretty much it that's my summary i really want to thank again i can't thank uh nina really helped me a lot with this i do appreciate all your help and city manager as well thank you donna i really appreciate you know the time and attention you gave this was my the first one i did on my own and uh i do appreciate everybody's input and cooperation thank you all right thank you joe um i think the big takeaway here is that uh we're doing a lot of infrastructure work across the city uh especially on infrastructure that uh quite frankly desperately needs it the been a long time coming and i think the other thing that's worth noting is all the grant money we've been able to bring in um to pay for this i mean we're talking tens of millions of dollars here that we're bringing in grant money so this is a very good news story we're getting uh getting a lot of things that need fixed fixed and uh we're getting help to pay for them so uh all right uh before we go to the public then i guess i'll circle back since i was jumped the gun there a little bit and ask if the council members have any questions i do not but i wanted to thank joe for a great job thank you yeah great great job you guys i don't think people realize how much work goes into these things um you know all they see is the end product they don't realize the months and months of work that go into getting us here thank you i appreciate that so uh all right anyone else not at this time but i too just want to thank joe and his team okay so uh all right dave why don't we uh move on to the uh public and uh who do we have first speaker is kevin heller okay good mr heller uh yeah joe great job thank you so much for the uh thorough uh presentation just one quick question i do apologize if you made this point and i missed it on the million 28.5 on the police it's all kind of grouped together vehicle tech precinct upgrades i'm just curious if any of those vehicles uh now or in the future are hybrid or fully electric and if so is there potentially grant funding available for for that either now or going forward in the future yeah i don't know if the commission is on maybe you can talk about that because that's a little out of my uh expertise thank you yeah sure so the vehicles that we're getting right now are the ones that are off of state bid our garage really doesn't have the capacity to fix electric vehicles right now with the training so we're staying with standard vehicles now i actually uh uh have some somewhat of a knowledge of uh really trying to look into electric vehicles into the future which will be a recommendation in the future because the operating cost overall are lower you don't have to pay for brakes you don't have to pay for transmissions there's no carbon stuff like that the issue we have though is the number of vehicles that you'll actually need for something like that as well as charging stations so you'd have to have vehicles where at the end of a shift you'd have to have double the amount of vehicles because the cops would have to be able to get into the patrol vehicles into other cars so that the cars that they use for the 12-hour tour would be recharged so there are considerations it's something that i'm definitely looking at for the future because i uh i care about my planet too so uh that's a great question though kevin thank you very much okay great thank you okay thanks kevin all right who's next dave uh next is roy lester okay hi john hi joe thanks thanks for uh the presentation um i do have a couple of questions on the sewer we're asking for new funds of 600 000 but it says here that we have already uh 1.4 million dollars worth of funds in existing bonding funds and uh the sewer will be taken over by nassau county and i understand the 600 000 is for the emergency repairs but the bonded funds you know i'm wondering what that money is going to and we seem to have a continuation of the sewer uh the costs over the years and i'm wondering what that is about the other thing i wanted to ask about is the well number 19. did we get bids on that for the 4 million and 19 is not working right now is that correct because you're saying we have eight wells you labeled three that were not working but you didn't label 19 is not working so well 19. i'm sorry right you finish your question yeah because otherwise they cut me off um and on police vehicles it seems like the police vehicles you know we're spending 283 for the three vehicles but then we also have allocated 200 000 for the vehicles in 2023 200 000 in 2024 200 000 in 2025 200 000 in 2026. i i'm wondering how often we're replacing the vehicles um the other question i have is on the economic development studies that's 465 000 just on studies it just seems to be a lot of money for studies and finally on the ice arena we're talking about 800 000 for the replacement of the roof and yet we only put in 3 500 on the ice arena for maintenance every year maybe if we put a little bit more into maintenance we wouldn't have to be replacing an thousand dollar roof or things like that you know i i look at the weld the well sporty four million dollars and we have nineteen thousand put aside for it we're not you know i guess it's the maintenance that's bothering me it's like you know not changing oil in the car because you don't want to spend the money on the oil but we end up then having to buy a new engine those are my questions um i'll try to pick off as many as i can um well number 19 is the proposed uh number for the new well so no it has not been built yet okay the the three that you know we do have eight wells and only only five are active right now so three of them one is collapse that's that's it it's out of service it's not gonna ever work again um number 17 we're having salt water issues what happens is you pump it for like three minutes and you get these really high quality fluoride readings that are wave um you know outside the limits and then within like two minutes or so three minutes it starts to they disappear and that's the one we just fixed right um 17 i don't know if it's one we just fixed but we really we can't use it to help let us know well number 11 is the one right on um pacific boulevard that's the one that wellhouse would recently that one what happens is you pump for the first five minutes it goes up to not 750 to 800 gallons per minute and then it loses its prime it goes to zero i've watched it happen i've been down there so we're in the process of uh doing a tv inspection they're gonna pull the pump and do a test pump there but there's a very good chance that that one might be uh collapsed as well um as far as the sewer money no no i asked about bids did we get bids on that no no right now it's we the only thing we awarded was the design that was at a previous council meeting we awarded the design to h2m they just commenced design you know i basically told them that i wanted them to hopefully finish the design by the end of this year then we'll go out to bid and build it presuming that this hopefully gets adopted um and build it in the uh spring of next year so the four million is just an estimate right now correct yeah yeah but i got that that estimate is from h2m i initially actually had 2.5 million in the capital budget before i finalized it and they basically said that they based on what's happening right now in the market that one million is the realistic number so um i mean it could be less it could be more it is just an estimate um that's correct um you mentioned six hundred thousand for the sewer and and the in in the in the spreadsheet that we prepared we do carry it out six hundred thousand dollars a year 2025 but if you notice in 2026 we stop we don't anticipate we'll be out of the bid hopefully we'll be out of the sewer business by 2000 supposed to be 2024 actually but um as far as this spreadsheet i i continued it until 2025. in 2026 there's nothing shown i believe um yeah because we should be i've been working and that's probably uh a meeting for i could take up a whole nother evening to work that's going on at the wastewater treatment plant but we should be out of the business by 2024.25 so you're correct about that um what was your other question i'm sorry you mentioned about the the existing you have down the existing uh bonded funds of almost 1.4 million for this sewer yeah that's very you know that's interesting that's that's a that's one of the things i mentioned earlier in the presentation i went through the exercise and and not just in the sewer department but in a lot of the other budget lines there was quite a bit of money that was bonded for but never spent um and i had a long conversation with the city manager and the city controller about this and it's something we're really gonna work on in the next in the coming months that if it's not gonna be used it's gotta be uh put towards debt service um because i i've observed a lot of that and not just in that fund but in technology and transportation um and you can see it on the spreadsheet if you look closely yeah but you know what i mean what i'm asking why do we need the 600 000 new money if we have that money well because remember it's only you can only use the money for what it's authorized for so if it says sewer repair in that line that's the only you can't use everything else that's on on the sewer it has to be designated over 500 so to speak so another way only the money that's authorized for sewer pass can be used for sewer repairs you can't use like replacing pumps from the sewer department for sewer main repairs it's got to be what it's authorized for i mean you could probably explain that much better than i can but um that's one of the things you gave me a very good education on you can only use the money for what it's authorized for okay and i asked about economic development is that something i don't know if patty's on i mean yes patty's available yeah she could probably describe those are projects that you know she requested um i don't really have a lot about dave can you move paddy up so she can speak if you want i can answer the question while you're waiting oh okay she just sent me a text said she could um go ahead and answer the question about the cars so roy asked about why we needed the money going forward uh right now yes to 200 000 every year yeah going forward okay yeah so uh maybe i just misstated it though so in any case uh we we right now are in a replacement cycle for our cars at 12.3 every 12.3 years our entire fleet will get replaced a typical police car runs 24 hours a day seven days a week and uh basically he's in motion 90 of that time as well the average uh aging of a police vehicle in one year one year is equivalent to three years of driving your personal car 30 000 miles a year so we are well below where we should be uh funded on that because we are really trying our best to take care of these cars the best we can and we're recycling older cars by even replacing motors and just up kind of giving them facelifts and uplifts so that we don't have to replace our cars as much we're hoping that uh over the next three years by replacing the three vehicles a year and our atv fleet as we go because they get pretty beat up throughout the year too on the beach running a lot in the sand and the assault that as the city recovers financially we'll be able to increase those funds to be able to make our replacement cycle what's typically recommended for a police department and public safety is every five years for police cars your larger fire department trucks and stuff like that when you think about they don't run 24 7 they sit in the garage and wait to be deployed a police car is manned all the time so uh we're well below the the uh industry average in cost for our fleet we have about 37 vehicles and uh it's about 12.33 uh years to replace our entire fleet hope that helps okay was patty going to come on up no she wasn't so roy we'll get you the answer to that question we'll post it to the website your question and the answer to the website like we are doing for the general okay thanks a lot thanks all right take care roy all right who's next dave that was it oh that was it okay so all right folks thanks for joining us but nope no james lynch just raised his hand okay might have just woke up when he uh when he heard me say thanks easy bendo good evening uh this question is for joe fabrizio joe first uh congratulations on your uh move to the head of the dpw thank you well deserved thank you my question is uh four years ago the city got a grant i believe it was four years ago to outline uh the uh infrastructure of the walks to replace the sewer and water lines and as recently as last year they came and uh the subcontractor came out and marked out the lines and uh where all the other utilities were going and somehow this thing seems to have died on the vine once again and i'm just wondering are there any other areas of the city that have clay sewer pipes going back to 1923 that are still in use that have not been upgraded um to answer the second part of the question i observed it today on the north side of park between new york and grand i think it's all clay all tile and it's old so that's pretty much what exists throughout the whole city um i do have a map showing like what areas we've upgraded over the last like 25 30 years but to answer your second question you're absolutely correct that that problem that project uh it's called the walks it's um basically upgrading all the water mains and sanitary remains and you're correct that it has stagnated unfortunately um the consulting firm uh working on it is the working model issue consulting engineers um they have yet to finalize the design um after this meeting i i will call them to find out what the status is it's it's definitely been going on way too long i agree with you um but you're correct that is a problem okay so thank can i ask this if you're gonna speak to them before the next uh or the ratification of this uh uh this uh budget can that be included because other other than that we'll be waiting another five years to to revisit this well it's included in a sense like if you look under the water fund i think there's over a million dollars in there um unfortunately um i think it's 1.2 million right under system upgrades there's a 1.2 million in existing funding um that's not enough unfortunately though for the complete replacement of the water mains because the intent is to basically abandon the 4-inch water mains that run behind the houses and put new eight-inch water mains down the actual street and then connect all the houses into them you probably it's probably on the order of two to three million um so my intent is based on their schedule is the problem realistically is the next capital budget is to request request additional money in that line um what system upgrades to request like say another million and a half two million so we have ample money to do it not next to them in the following year in other words 20 to after next july all right but it's going to stay on the radar that it hasn't died on the vine no it hasn't but you i agree 100 i mean it is it's it's taking a lot longer than it should i think in my opinion um i i agree with you um but we have to what's the word to uh get it to grow again we have to you're absolutely right and and it's a valid concern valid point and i can update you on that after i talk to the consultant absolutely and but my goal was to actually realistically we're going to ask for more money in next year's capital budget because this one is a lot higher than than than i wanted it to be but the wells was certainly a priority just to put additional money in for the next capital budget so we could do it after uh july of next year understood all right thank you that's a good question thank you thanks jamie um anyone else dave nope that's all all right thanks for joining us wait wait wait do i have a motion to close i'm sorry i did it again wow that's okay most of the clothes get punched happy who will make a motion to close the night well thank you second i will thank you voting council member delorey yes councilmember mandel yes councilmember treston yes and thank you again joe vice president mcginnis yes president bendo yes all right now i could say good night so uh thanks for joining us thank you thank you joe and your staff and ena and everyone who worked on this like i said uh people just see the end products they don't realize the amount of work that goes into developing this and the budget and it's a huge undertaking for the entire staff so thank you and uh we will see you all at the next meeting next meeting is this upcoming tuesday at 7pm